Concrete – Cast-in-Place
Certified inspections that verify strength, durability and structural stability of cast-in-place concrete.
- Reinforcing steel size, spacing & cover
- Formwork, embeds & pre-pour review
- Placement, sampling & curing verification
Code-specific special inspections across New York City, delivered by a P.E.-led team. We inspect at the right milestones, document clearly and support your TR1 filings through DOB sign-off.

Special inspections only help your schedule when they are planned around the work. We read the approved drawings and filing requirements first, then build the inspections into your construction sequence.
Your job will likely also need a Tenant Protection Plan and weekly TPP compliance inspections under BC 1705.26.
Momentum is qualified to perform the following Class 2 special inspections under the NYC Building Code, along with RDP sidewalk shed inspections. Each inspection is code-specific, documented and backed by professional engineering accountability.
















Certified inspections that verify strength, durability and structural stability of cast-in-place concrete.
Verifying that masonry construction complies with approved documents and the NYC Building Code.
Protecting the structural integrity of existing buildings during alteration and renovation work.
Ensuring fire-resistance-rated assemblies perform as designed to protect life and property.
Anchoring system validation so connections perform to their design capacity.
Minimizing impact on neighboring buildings during excavation, foundation and demolition work.
Keeping occupied buildings safe and habitable while construction is underway.
Signed and sealed physical examinations and reports required to renew sidewalk shed permits under the “Get Sheds Down” laws.
Send us your drawings and project scope — we'll confirm scope, schedule and fee quickly.
Request Engineering ServiceThe NYC Building Code identifies certain materials, installations and operations as critical enough to need a second set of eyes. Special inspections are that second set of eyes: a qualified inspector observes the work at defined milestones and confirms that it matches the approved construction documents before it is covered up or put into service.
Which inspections apply depends on the scope of work. They are identified by the design professional and listed on the job’s technical report (TR1). Typical examples include cast-in-place concrete, masonry, structural stability during alterations, firestopping, post-installed anchors, work affecting adjacent buildings, and Tenant Protection Plan compliance in occupied residential buildings.
The owner must retain the Special Inspection Agency. DOB is explicit that an entity that is only the contractor cannot hire the SIA, and the agency must report uncorrected discrepancies directly to the owner. This keeps the inspector independent of the people doing the work.
| Type | What it covers |
|---|---|
| Special inspection | Critical materials and operations listed in BC Chapter 17, such as concrete, masonry, firestop, anchors and structural stability |
| Progress inspection | Milestone checks of general construction, such as footings, energy code items and final inspection |
| Who performs | Both are performed by qualified inspectors and documented on the job’s technical reports |
General information about NYC requirements as of November 2026; not legal advice. Requirements are confirmed for each project against the current NYC Construction Codes and DOB rules.
An independent inspection of specific construction work, such as concrete, masonry, firestopping or anchors, that the NYC Building Code requires to be verified by a qualified special inspector working for a DOB-registered Special Inspection Agency.
The owner. Under BC 1704.1 the Special Inspection Agency must be retained by the owner, and an entity that is only the contractor cannot hire it.
The TR1 technical report lists the special and progress inspections required for a job and the agency responsible for each one. Responsibilities are generally assigned before the permit is issued.
Concrete (cast-in-place), masonry, structural stability for alterations of existing buildings, fire-resistant penetrations and joints (firestop), post-installed anchors, construction operations influencing adjacent structures, and Tenant Protection Plan compliance.
Before the permit request, so the inspection responsibilities are in place on the TR1 and inspections can be scheduled around the construction sequence.
The inspector reports it to the owner and project team so it can be corrected while the work is still accessible, then re-inspects. Uncorrected discrepancies must be reported to the owner.
We focus on rapid turnaround. Send your job number, scope and schedule and we will confirm availability and fees promptly.
Tell us about your project and we’ll respond promptly.