(718) 838-8187 info@momentum-dc.com 15 Tuve Ln, S. Hackensack, NJ 07606
Building Momentum, Ensuring Compliance.
MOMENTUMENGINEERING CONSULTANT, PLLC
Momentum Engineering · NYC & NJ

Sidewalk Shed Permit Renewal & RDP Inspections

NYC now requires a sealed Registered Design Professional report with sidewalk shed permit renewals. Our P.E.s perform the physical examinations and prepare DOB-ready reports so your shed permit stays current.

Sidewalk Shed Permit Renewal RDP Inspections by Momentum Engineering Consultant in New York City
Related ResourcesGuide: NYC Sidewalk Shed Rules 2026 →DOB Rule 1 RCNY §102-07 (PDF) ↗CD-5 Suspended Scaffold Design →Shed & Scaffold Permit Expediting →
Service 03 · Get Sheds Down

What Our RDP Renewal Reports Cover

NYC now requires a Registered Design Professional to examine the building and file a signed, sealed report with every sidewalk shed permit renewal — showing that repair work is actually moving forward. Momentum's P.E.s perform the physical examinations, prepare DOB-ready reports and help owners stay ahead of the new penalties.

Sidewalk shed along a pre-war building on Central Park West, New York City
Sidewalk Shed · Physical Examination
  • Initial & renewal physical examinations
  • Signed & sealed renewal reports
  • Repair milestone schedules
  • Work progress log review
  • Unsafe-condition notification
  • Extension request support
Renew Your Shed Permit
Code RequirementsAt a Glance
BC 106.8.3

Every sidewalk shed permit renewal must include a report from an RDP (P.E. or R.A.) based on a physical examination of the building.

LL 48 of 2025

Part of the “Get Sheds Down” package: shorter 90-day shed permits and penalties when repair work does not progress.

1 RCNY §102-07

Report must document work completed since the last renewal, work in progress and the anticipated completion date, with labeled photos of all elevations.

Work Progress Log

Permit holder keeps a log updated at least weekly, available to DOB and the RDP.

Penalties

Monthly penalties for no progress, plus one-time penalties for missed façade repair milestones (5 months, 8 months, 2 years).

DOB Fees

Since August 17, 2026, each renewal carries a $130 renewal fee plus a $90 progress report fee — $220 per renewal where the report is required.

Progress report requirement in effect for sidewalk shed renewals in DOB NOW since August 17, 2026. Excepted: sheds for one- and two-family homes, and sheds for new building, enlargement or demolition work with an issued permit.
Service Area

Sidewalk Shed RDP Inspections Across NYC & Northern NJ

FAQ

Sidewalk Shed RDP Inspections: Common Questions

Why do I need an RDP report to renew a sidewalk shed permit?

Under the Get Sheds Down laws, renewal applications must include a report from a Registered Design Professional (P.E. or R.A.) describing work completed since the last renewal, work in progress and the anticipated completion date.

How long is a sidewalk shed permit valid?

Sidewalk shed permits are now limited to 90-day terms, so a renewal report is needed regularly while the shed remains up.

What happens if repair work does not progress?

Owners can face monthly penalties when work does not progress, plus penalties for missed facade repair milestones. A clear milestone schedule and timely reports help avoid them.

How much are the DOB fees for a sidewalk shed renewal?

Since August 17, 2026, each renewal carries a $130 renewal fee, plus a $90 progress report fee where the RDP progress report is required, for a total of $220 per renewal.

Ready to move your project forward?

Tell us about your project and we’ll respond promptly.